When your builder tells you the home has reached practical completion, they will ask for the final payment. Before you pay, it is worth having the home independently inspected. Once the final payment is made, getting a builder back to fix items can become much harder.
What practical completion means
Practical completion is the stage where the home is finished in line with the contract, plans and specifications, apart from minor omissions or defects that don't stop you using it. A practical completion inspection (PCI) checks that claim.
What we check
- Workmanship of finishes: plaster, paint, tiling, joinery and flooring
- Doors and windows: operation, seals, hardware and glazing
- Wet areas: tiling falls, grout and silicone, signs of water getting where it shouldn't
- Exterior: brickwork, render, cladding, flashings and weep holes
- Roof and roof void, where safe access allows
- Paths, drainage and ground levels around the home
The standard we measure against
In Victoria, the Guide to Standards and Tolerances published by the Building and Plumbing Commission (which replaced the VBA) sets out what is acceptable for things like plaster finishes, gaps, cracks and level floors. We reference it in our PCI reports, so your builder can see exactly why an item is listed.
Using the report
Send the report to your builder and ask for the items to be fixed before you pay, or agree in writing on a timeframe. Keep a copy, because it is also a useful record if issues appear during the defects liability period.
Read more about our new home and PCI inspections or book online.